DESIGN AND CONSTRUCTION FOR CONTAINER TERMINAL 2 EXPANSION PROJECT, UAE
±¹°¡: ¾Æ¶ø¿¡¹Ì·¹ÀÌÆ® ¹ßÁÖó: Shafa Al Nahdah Building Contracting LLC ±â°£: 2016-03-08~2016-12-31
- Tendering Stage
* Review and clarification for tendering requirement
* Tender design and BOQ after review the tendering design
* Design optinization for clarification of DP world
* Engineering/Construction Execution plan
* Detailed techniacl proposal for engineering/construction programme
* Technical report and clarfication for optimized pile capacity and soil bearing capacity
* Detailed method statement, etc
- Engineering Design Plan/Field Engineering
- Design and Construction Quality Control, Verification and Supervising
- As-built work for Design/Construction work