CirebonII 1x1,000MW Coal Fired Power(Ãë¹è¼ö(INTAKE)¼³°è)
±¹°¡: Àεµ³×½Ã¾Æ ¹ßÁÖó: Çö´ë¿£Áö´Ï¾î¸µ ±â°£: 2017-01-17~2021-04-30 |
|
|
1) Basic Design for C.W System
- Hydraulic Analysis for Intake & Outfall System
- Civil Work for C.W Pipeline
- Temporary Facilities / Dewatering System
- Shore Protection & Scour Protection
- ±âº»¼³°èÁ¶°Ç °ËÅä
: Design Criteria Review
: Tech. Specification / Code Study
: Soil Investigation Report Review
: Contract Tech. Specification Review
|
|
|